| File Reference : | F-HS23 Method Statement Template |
| Date File Updated | 02-10-26 |
| Category | Health & Safety Form Templates | Tags: ISO 45001, 8.1, ISO 45001:2018, method statement, safe system of work, health and safety |
Included in the alphaZ subscription
Every alphaZ document and toolkit, with updates as they are released. Everything you download is yours to keep.
You are logged in as an alphaZ subscriber
This document's file is ready to download from the Download Files tab below.
A method statement is just the safe sequence for doing a job, written down. We use this to set out each stage, the equipment and PPE required, and the emergency arrangements, so that safe work can be carried out.
This form template is supplied in fully editable MS Word format and can be easily customised and edited. The document uses pre-defined style formatting throughout, with all text in Calibri font for improved readability.
The following document labelling is included in the footer:
- Form number and title
- Information-classification
- Version
- Page number / total pages
Further guidance on safe systems of work and method statements:
Download this form template with your company name and logo already added!
Document Preparation is included with the alphaZ subscription.
This file is included in the alphaZ subscription. This form is also included in the ISO 45001 Toolkit and every alphaZ ISO toolkit that covers health and safety, so if you need the wider set of documents for method statements and safe systems of work, the toolkit route gives you this file plus everything else you need in one download.
If you'd like hands-on help writing your method statements or your wider health and safety management system, our remote support services provide direct expert input from our team, by the day, by project, or on an ongoing basis.
Method Statement Template
A full method statement for setting out how a task or activity will be carried out safely, stage by stage. It links to the relevant risk assessments, records the plant, PPE, supervision and competence needed, and captures material, documentation and emergency arrangements, with a sign-off sheet for the people briefed.
A method statement is the written safe system of work that turns a risk assessment into practical instructions, as expected under the Management of Health and Safety at Work Regulations 1999 and routinely required on construction and contracted work. It supports the operational control requirements of ISO 45001.
Built for ISO 45001 and Safe Systems of Work
The method statement supports the operational planning and control requirements of ISO 45001 (clause 8.1):
- A clear link to the relevant risk assessments, COSHH assessments and safety guidance for the task
- The plant, equipment, PPE and safety equipment required, alongside supervision, permit and competence requirements
- A numbered, stage-by-stage safe method of work, including pre-start
- Material, documentation and emergency arrangements, with a briefing sign-off sheet
What's Included in this Method Statement
The form is set out so a safe method can be written, briefed and signed in one document:
- Header - prepared by, date, method statement number and a description of the task or activity covered
- Related documents - relevant risk assessments, COSHH and safety guidance
- Requirements - plant, equipment and PPE, plus supervision, permits and competence
- Safe method of work - a numbered sequence of stages from pre-start onwards
- Arrangements - material and documentation requirements, emergency arrangements and notes
- Briefing record - name, signature and date for everyone the method statement is briefed to
Who Needs a Method Statement?
Any organisation carrying out work where the safe sequence matters - construction and trades, installation, maintenance, and higher-risk tasks in manufacturing and facilities. Method statements are routinely requested by principal contractors and clients, and support any business working towards or maintaining ISO 45001 certification.
Included in the ISO 45001 Toolkit
This form is part of the ISO 45001 Toolkit - risk assessments, method statements, procedures and guidance for managing health and safety in one download - and is included in every alphaZ ISO toolkit that covers ISO 45001.
Pairs with the Risk Assessment and Method Statement
Where the risk assessment and method statement belong together, use the combined F-HS29 Risk Assessment / Method Statement. For shorter jobs see the F-HS24 Method Statement - Task and the F-HS25 Method Statement - Machine.
These files are for alphaZ subscribers. Log in to the subscriber library once and each file below downloads straight away. Not a subscriber yet? See the alphaZ subscription.
Each file downloads straight away. You can also browse the subscriber library.
- F-HS23 Method Statement Word, 32 KB



