F-HS29 Risk Assessment Method Statement
File Reference : F-HS29 Risk Assessment Method Statement
Date File Updated 02-10-26
Category Health & Safety Form Templates
Tags: ISO 45001, 6.1.2, 8.1, ISO 45001:2018, RAMS, method statement, health and safety

Included in the alphaZ subscription

Every alphaZ document and toolkit, with updates as they are released. Everything you download is yours to keep.

alphaZ subscription Subscriber access

You are logged in as an alphaZ subscriber

This document's 2 files are ready to download from the Download Files tab below.

Sometimes the risk assessment and the method statement can be combined on one document. It assesses the hazards and controls, then sets out the safe method of work.

Effective Form Templates

This form template is supplied in fully editable MS Word format and can be easily customised and edited. The document uses pre-defined style formatting throughout, with all text in Calibri font for improved readability.
The following document labelling is included in the footer:

  • Form number and title
  • Information-classification
  • Version
  • Page number / total pages
alphaZ documents - beautifully designed, tried and tested form templates. No junk, jargon or unnecessary fields. Simple and usable form templates developed over 25 years through practical use in the real world.
Further Reading
Further Reading

Further guidance on risk assessments and safe systems of work:

Document Preparation
Logo Update Service

Download this form template with your company name and logo already added!
Document Preparation is included with the alphaZ subscription.

How to Download

This file is included in the alphaZ subscription. This form is also included in the ISO 45001 Toolkit and every alphaZ ISO toolkit that covers health and safety, so if you need the wider set of documents for risk assessments and method statements, the toolkit route gives you this file plus everything else you need in one download.

Implementation Support
Need Help Implementing?

If you'd like hands-on help preparing your risk assessments and method statements or your wider health and safety management system, our remote support services provide direct expert input from our team, by the day, by project, or on an ongoing basis.

File Formats

Risk Assessment and Method Statement Template

A combined risk assessment and method statement - a RAMS - on a single document. It assesses each activity, hazard and consequence with the inherent and residual risk ratings and controls, then sets out the safe method of work, supervision, competence, material and documentation requirements, with a briefing sign-off.

A RAMS brings the risk assessment required by the Management of Health and Safety at Work Regulations 1999 together with the written safe system of work in one document - the format principal contractors and clients most often ask for. It supports the risk assessment and operational control requirements of ISO 45001.

Built for ISO 45001 and Combined RAMS

The document supports the hazard identification, risk assessment and operational control requirements of ISO 45001 (clauses 6.1.2 and 8.1):

  • The activity, hazards and consequences assessed with inherent and residual risk ratings
  • The control measures in place recorded against each hazard
  • A safe method of work following on from the assessment
  • Supervision, competence, material and documentation requirements, with a briefing sign-off

What's Included in this Risk Assessment / Method Statement

The document runs from assessment through to a briefed safe method in one place:

  • Header - completed by, date completed, number, the location, task or activity, and who is affected or at risk
  • Risk assessment - numbered activities, hazards and consequences with inherent risk rating, control measures in place and residual risk rating
  • Safe method of work - how the work is to be carried out safely
  • Requirements - supervision, permits and competence, material and documentation requirements, and notes
  • Briefing record - name, signature and date for everyone briefed

Who Needs a Risk Assessment / Method Statement?

Any organisation asked for a RAMS - most commonly construction, trades, installation and contracted work where a principal contractor or client requires a combined document before work starts. It also suits higher-risk tasks in manufacturing and facilities, and any business working towards or maintaining ISO 45001 certification.

Included in the ISO 45001 Toolkit

This form is part of the ISO 45001 Toolkit - risk assessments, method statements, procedures and guidance for managing health and safety in one download - and is included in every alphaZ ISO toolkit that covers ISO 45001.

Pairs with the Method Statement and Risk Assessment

Where you keep them separate, use the F-HS20 General Risk Assessment and the F-HS23 Method Statement. For a single task see the F-HS24 Method Statement - Task.

These files are for alphaZ subscribers. Log in to the subscriber library once and each file below downloads straight away. Not a subscriber yet? See the alphaZ subscription.

Each file downloads straight away. You can also browse the subscriber library.