| File Reference : | F-HS24 Method Statement Task |
| Date File Updated | 02-10-26 |
| Category | Health & Safety Form Templates | Tags: ISO 45001, 8.1, ISO 45001:2018, method statement, safe system of work, health and safety |
Included in the alphaZ subscription
Every alphaZ document and toolkit, with updates as they are released. Everything you download is yours to keep.
You are logged in as an alphaZ subscriber
This document's file is ready to download from the Download Files tab below.
This form records the task description, relevant risk assessments completed, safe method of work, the PPE and the competence needed, with additional sections for material and documentation requirements.
This form template is supplied in fully editable MS Word format and can be easily customised and edited. The document uses pre-defined style formatting throughout, with all text in Calibri font for improved readability.
The following document labelling is included in the footer:
- Form number and title
- Information-classification
- Version
- Page number / total pages
Further guidance on safe systems of work for tasks:
Download this form template with your company name and logo already added!
Document Preparation is included with the alphaZ subscription.
This file is included in the alphaZ subscription. This form is also included in the ISO 45001 Toolkit and every alphaZ ISO toolkit that covers health and safety, so if you need the wider set of documents for task method statements and safe systems of work, the toolkit route gives you this file plus everything else you need in one download.
If you'd like hands-on help writing your method statements or your wider health and safety management system, our remote support services provide direct expert input from our team, by the day, by project, or on an ongoing basis.
Task Method Statement Template
A shorter method statement for a single task, keeping the safe method of work front and centre. It links to the relevant risk assessments and safety guidance and records the PPE, supervision, competence, material and documentation needed, without the wider project detail of a full method statement.
A task method statement is the written safe system of work for a specific job, as expected under the Management of Health and Safety at Work Regulations 1999. It supports the operational control requirements of ISO 45001 and suits work that does not need a full multi-stage method statement.
Built for ISO 45001 and Task-Level Safe Working
The form supports the operational control requirements of ISO 45001 (clause 8.1):
- A link to the relevant risk assessments, COSHH assessments and safety guidance for the task
- The safe method of work set out clearly for the task
- PPE and safety equipment, supervision, permits and competence requirements
- Material and documentation requirements, with space for notes
What's Included in this Task Method Statement
The form is deliberately concise so it is quick to produce for a single job:
- Header - prepared by, date, method statement number and a description of the task
- Related documents - relevant risk assessments, COSHH and safety guidance
- Safe method of work - how the task is to be carried out safely
- Requirements - PPE and safety equipment, supervision, permits and competence, material and documentation requirements, and notes
Who Needs a Task Method Statement?
Any organisation that needs a safe system of work for a specific task without the overhead of a full project method statement - trades, maintenance, installation and service teams, and manufacturing. It supports any business working towards or maintaining ISO 45001 certification.
Pairs with the Full Method Statement
For multi-stage work use the full F-HS23 Method Statement, and for equipment see the F-HS25 Method Statement - Machine. Where the assessment and method belong together, use the F-HS29 Risk Assessment / Method Statement.
These files are for alphaZ subscribers. Log in to the subscriber library once and each file below downloads straight away. Not a subscriber yet? See the alphaZ subscription.
Each file downloads straight away. You can also browse the subscriber library.
- F-HS24 Method Statement Task Word, 31 KB



